While visiting Disney’s Hollywood Studios recently, we noticed that low construction walls were in place at BaseLine Tap House. This is the second time in less than a year that this particular corner of the outdoor seating area has had some work done. Back in December 2023, we noticed that there was some construction going on, but it appeared to be completed about a week later. Now, construction walls are back, and an already popular seating area has had its capacity reduced.
Construction at BaseLine Tap House
The work appears to be related to underground utilities in the area, with a few drains in place around the area. Here’s a look at the low wall, which reduces the outdoor seating by some 30%.