Frozen Ever After and Royal Sommerhus construction update

|

|

Today we made it out to Epcot to check out the progress that has been made on the Royal Sommerhus and Frozen Ever After areas within the Norway pavilion.

FrozenEverAfter_01092016-1

One thing of note is that the bathrooms are now completely walled off until the ride opens this Spring.

FrozenEverAfter_01092016-2

Progress on the Royal Sommerhus buildings looks to be coming along nicely.

FrozenEverAfter_01092016-3

The old entrance to Maelstrom is completely walled off with a scrim up.

FrozenEverAfter_01092016-4 FrozenEverAfter_01092016-5

Why this matters

While there was a very vocal disapproval of changing out Maelstrom for a Frozen-themed ride, there is no doubt that a ride and meet and greet area like this will take the strain off of wait times at Soarin’ and Test Track.

 

 

Have a Story Tip? Contact Us!

More Articles

5 COMMENTS

  1. Just test track now, so that line will insane until the new frozen ride opens . Soarin is down now for refurb till the summer i believe.

  2. I think the official name is “Royal Sommerhus” (not haus) (sommerhus in Norwegian means summer-cottage). Love Your updates, thanx!

Comments are closed.

Related

Walt Disney, Anna, and Elsa Have Something in Common After Frozen Ever After Upgrades

It's been nearly a month since the Frozen Ever...

Frozen Ever After Reopens to Large Crowds at EPCOT

Good morning from EPCOT, where the Frozen Ever After...

Frozen Ever After Reopens with Upgraded Audio-Animatronics at EPCOT (PHOTOS, FULL RIDE VIDEO)

Good evening from EPCOT where the Frozen Ever After...

FIRST LOOK at New Frozen Ever After Audio-Animatronics at EPCOT

Walt Disney World has released new images of the...

More Than a Facelift: Inside Look at Changes Coming to Frozen Ever After at EPCOT

In an interview with the Orlando Sentinel, Walt Disney...