Over at the Tiana’s Bayou Adventure construction site, walls are up and crews are working on preparing the former Splash Mountain attraction for a retheme into Tiana’s Bayou Adventure.
The briar pool was draining this morning as crews worked to get the site completely dry before the transformation can begin.
Not much had changed in the queue beside the installation of low construction walls that we took a look at earlier.
Most, but not all, signage was still in place. More on that in a bit.
As always, keep checking back with us here at BlogMickey.com as we continue to bring you the latest news, photos, and info from around the Disney Parks!