Work Begins on Bringing Tiana’s Bayou Adventure to Life at Magic Kingdom

|

|

Over at the Tiana’s Bayou Adventure construction site, walls are up and crews are working on preparing the former Splash Mountain attraction for a retheme into Tiana’s Bayou Adventure.

The briar pool was draining this morning as crews worked to get the site completely dry before the transformation can begin.

Not much had changed in the queue beside the installation of low construction walls that we took a look at earlier.

Most, but not all, signage was still in place. More on that in a bit.

As always, keep checking back with us here at BlogMickey.com as we continue to bring you the latest news, photos, and info from around the Disney Parks!

Have a Story Tip? Contact Us!

More Articles

Related

Frontierland Boardwalk Demolished at Magic Kingdom

Crews have (effectively) completely demolished the Frontierland boardwalk at...

Disney World Sets Reopening Date for Tiana’s Bayou Adventure Following Refurbishment

Tiana's Bayou Adventure has a reopening date. Walt Disney...

New Imagineering Permit Could Be Latest Sign Big Thunder’s Opossums Are Returning

Walt Disney Imagineering has filed a permit to "install...

Possible Possum Revival at Big Thunder Mountain Railroad

A new tarp on the tree that once held...

New Pirate Parrot Mug Coming Soon to The Beak and Barrel

Walt Disney World has announced that a new souvenir...