New Imagineering Permit Could Signal Villains Land Work

|

|

Walt Disney Imagineering filed a Notice of Commencement today for general construction at 1612 Magic Kingdom Drive. That address doesn’t exist in the public Central Florida Tourism Oversight District address database. PCL Construction Services is the contractor, the same company listed two months ago on a filing for 1610 Magic Kingdom Drive. The closest existing address belongs to the Haunted Mansion at 1600 Magic Kingdom Drive, right on the edge of the Piston Peak National Park and Villains Land construction site. Here’s the latest.

New Magic Kingdom Address Appears in Imagineering Filing, Possibly Villains Land


IN THIS ARTICLE:

  • Walt Disney Imagineering filed paperwork for general construction at 1612 Magic Kingdom Drive, a new address near Haunted Mansion.
  • PCL Construction Services is the contractor, the same company on September’s filing for 1610 Magic Kingdom Drive.
  • The new address sits closest to the Haunted Mansion, next to the Villains Land construction site.

This is the second brand-new address to show up near the Haunted Mansion this fall. Imagineering is the owner on both filings, with PCL Construction Services listed as the contractor.

A Second New Address Near Haunted Mansion

In September, Imagineering filed a Notice of Commencement for 1610 Magic Kingdom Drive. That address also had no entry in the Oversight District’s database. A new address typically signals a new structure.

At the time, we thought 1610 could belong to the roughly 5,800-square-foot building next to the Haunted Mansion. The Piston Peak National Park model at D23 Expo labeled that building as a restroom facility. With a second address now on file, at least one of these numbers likely belongs to something else.

Why Villains Land Is a Likely Fit

Villains Land is a strong candidate for that “something else”. The January permit filings laid out Villains Land buildings of roughly 83,000, 55,000, 16,000, and 8,500 square feet across the former Rivers of America basin. When site work began for the Villains Land show buildings in June, the grading was most obvious for the northeast show building behind the Haunted Mansion.

Construction site for Villains Land show buildings at Disney World.

Disney has since confirmed a Maleficent roller coaster and a Magic Mirror dark ride as the land’s two headlining attractions. An address in the 1600 block would put this building on the Haunted Mansion side of the site, which is where Villains Land sits.

We think these Magic Kingdom Drive addresses could be for Villains Land. The former Tom Sawyer Island area, where Piston Peak is going, has Caribbean Way addresses, so Magic Kingdom Drive numbers may point to a different part of the project. I’d file this one under “likely” until the address gets added to the database.

Map view of Magic Kingdom with the Haunted Mansion labeled at 1600 Magic Kingdom Dr.

The Story So Far

As always, keep checking back with us here at BlogMickey.com as we continue to bring you the latest news, photos, and info from around the Disney Parks!

Have a Story Tip? Contact Us!

More Articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Related

Imagineering Extends Tropical Americas Permit to November 2027

Walt Disney Imagineering has amended its permit paperwork for...

Villains Take Over Main Street USA for ABC Christmas Day Parade Taping

The Disney Villains led the way down Main Street...

Glob Theater Permit Extended Into November 2027 at Hollywood Studios

Walt Disney Imagineering has extended a permit at The...

Is “Project La Brea” the Codename for the Monsters Inc. Coaster?

A codename has turned up on Walt Disney Imagineering's...

After Play Disney Parks App Ends, Imagineering Launches Experimental ‘Labs’ App

Walt Disney Imagineering has a new app, and it...